Under River HDPE Pipe Pull

Midwest Mole crews installed 4,500 feet of 16” HDPE pipe under the Maumee River to connect Fort Wayne’s water supply on the north and south sides of the river. Due to the length of the river crossing, we needed a 1,000-foot bore that crossed under a functioning public trail system and a 48”-diameter reinforced concrete sanitary sewer. MWTA120_Under River HDPE Pipe Pull_32-33